Friday, February 12, 2010

Post-Plastering Lull ...

There is something about the day after plastering. It's not that plastering is physically or mentally challenging, but somehow the next day is a drag. Maybe it is that plastering transforms the place so much that we get a great feeling of accomplishment, and take a mental holiday.

So while driving to town (for the second time, and to go to a wine tasting) we tried to emphasize, no wait, magnify, what we did today to make us feel better:
  • installed two floor planks (see picture)
  • did laundry
  • got groceries
  • made chocolate filled pretzels
  • did dishes
  • installed beer hall sconces
  • met with our logo designer (to drop off a valentine's chocolate filled pretzel)
As you can see, the list is long and exhausting. What a day!!!


Dirk

No comments: